Attendance: 2/06/09
*Christopher Pixley
Jessica
Kyla
Ben Pixley
Agenda:
*Make a better bucket model
Member comments/input:
*Chris: With the newly designed bucket model I managed to shape sheet metal into the form of
the bucket we wanted and drilled the holes needed to secure the bucket into the arm mechanism. This worked out well and the bucket is in just the right place we want it to be in.
Monday, February 9, 2009
Friday 1/30/09
Attendance:
Jessica
Terry
Chris
Agenda:
1. Make a limit switch for the arm to prevent it from cranking down on the wheel.
2. Get the bucket servos working.
3. Move the battery
4. Make the bucket
Comments:
Chris: I managed to get the touch sensor mounted with Jessica's help. Then I got the touch sensor into the programing, what I wrote will
prevent the arm from cranking down on the wheel but still allow the arm to come back up. Then I got the servos into the program.
Jessica:
Terry:
Attendance:
Jessica
Terry
Chris
Agenda:
1. Make a limit switch for the arm to prevent it from cranking down on the wheel.
2. Get the bucket servos working.
3. Move the battery
4. Make the bucket
Comments:
Chris: I managed to get the touch sensor mounted with Jessica's help. Then I got the touch sensor into the programing, what I wrote will
prevent the arm from cranking down on the wheel but still allow the arm to come back up. Then I got the servos into the program.
Jessica:
Terry:
Friday, January 23, 2009
This was from the scrimmage on January 17-18.
Attendance:
*Jessica
Agenda:
*Work on robot
Member comments/input:
*Saturday:
I attached the arm to the robot. The screws were on wrong on the servo bracket. They were to short, so we needed to replace them with longer screws. They held the servo bracket to the arm.
From testing the robot out, we need to drive the robot up the ramp backwards so that the motors propel the robot forward. We were going to attach the gears and motor to the arm so it can move. We couldn't figure out how to attach the tube so we switched to an axle. Then we had some problems with the size of the gear. We used the larger ones. But even after we set it all up, it STILL wouldn't move.
Sunday:
Once we had the arm working we had some problems with it. It would slam down. We experimented a couple times and it finally vanished. But we couldn't get up the ramp because there was too much weight. I put the battery in the front/back and it WORKED!!!
Attendance:
*Jessica
Agenda:
*Work on robot
Member comments/input:
*Saturday:
I attached the arm to the robot. The screws were on wrong on the servo bracket. They were to short, so we needed to replace them with longer screws. They held the servo bracket to the arm.
From testing the robot out, we need to drive the robot up the ramp backwards so that the motors propel the robot forward. We were going to attach the gears and motor to the arm so it can move. We couldn't figure out how to attach the tube so we switched to an axle. Then we had some problems with the size of the gear. We used the larger ones. But even after we set it all up, it STILL wouldn't move.
Sunday:Once we had the arm working we had some problems with it. It would slam down. We experimented a couple times and it finally vanished. But we couldn't get up the ramp because there was too much weight. I put the battery in the front/back and it WORKED!!!
Tuesday, January 20, 2009
Attendance: 1-9-09
*
Nolan Dedrickson
Chris Pixley
Ben Pixley
Travis Smith
Kyler
Kyla Overbay
Jessica
Keegan
Agenda:
*Find out what drive system we want.
Member comments/input:
*Christopher Pixley: I managed to go through with Jeff McBride an learn
basic programming for robot c and will be able to get the motors and sensors
wired up next meeting
A new design for the manipulator. Drawn by Ben Pixley.
A design drawn by Ben Pixley for the bot.
*
Nolan Dedrickson
Chris Pixley
Ben Pixley
Travis Smith
Kyler
Kyla Overbay
Jessica
Keegan
Agenda:
*Find out what drive system we want.
Member comments/input:
*Christopher Pixley: I managed to go through with Jeff McBride an learn
basic programming for robot c and will be able to get the motors and sensors
wired up next meeting
A new design for the manipulator. Drawn by Ben Pixley.
A design drawn by Ben Pixley for the bot.
Tuesday, December 9, 2008
Friday 11/21/08
attendance-
Gabe Law
Nolan Dedrickson
Chris Pixley
Ben Pixley
Travis Smith
Kyler
Kyla Overbay
Agenda
1. Take pictures of the robot because we missed taking pictures last time.
2. Build wall panels + add tape
3. Manipulator arm + throgh
4.take after robot picture
5.blog
6.clean up
Kyla got onto the teams blog via Nolan's instruction. Gabe, Kyler, and Ben are working on the wall panels.
Chris worked on blogs. Nolan and Kyla change the manipulator arm servos to a more robust design.
Gabe made the agenda with Ben and Chris. Gabe worked on wall pannels with Travis, Kyler, Ben and John.
Ben we went into construction room we then went about measuring the pipes and cutting them to the measurements
we had a few draw backs which includes the pipes and measurements we after a time were successful
we cut out the long pipes medium and short pipes we then measure and trim the board for the walls we put all
the equipment together to be put together at a later day Kyler and Gabe helped with measurements.
attendance-
Gabe Law
Nolan Dedrickson
Chris Pixley
Ben Pixley
Travis Smith
Kyler
Kyla Overbay
Agenda
1. Take pictures of the robot because we missed taking pictures last time.
2. Build wall panels + add tape
3. Manipulator arm + throgh
4.take after robot picture
5.blog
6.clean up
Kyla got onto the teams blog via Nolan's instruction. Gabe, Kyler, and Ben are working on the wall panels.
Chris worked on blogs. Nolan and Kyla change the manipulator arm servos to a more robust design.
Gabe made the agenda with Ben and Chris. Gabe worked on wall pannels with Travis, Kyler, Ben and John.
Ben we went into construction room we then went about measuring the pipes and cutting them to the measurements
we had a few draw backs which includes the pipes and measurements we after a time were successful
we cut out the long pipes medium and short pipes we then measure and trim the board for the walls we put all
the equipment together to be put together at a later day Kyler and Gabe helped with measurements.
Subscribe to: